Pavilion Project Update – Kitchen & Toilets Installed

Posted in Uncategorized on Monday, March 3rd, 2014 at 10:14 am

The kitchen and toilets are currently being installed.

Work is nearing completion inside the building now, with the kitchen units and appliances being installed along with the disabled/unisex toilet and the gents toilet.

Also added are replacement windows for both changing rooms, the vinyl flooring for the corridor between the main hall and the fire exit and in the kitchen, a telephone line with WIFI access and 4 speakers – one in each corner of the main room.

More photos here