Day two sees the new entrance drive being dug out.
The new driveway leading to the new building has been dug out ready for filling with compacted crushed concrete. Originally designed as an access route for heavy vehicles during the construction phase, the new drive will be alongside the hedge on the pavilion side of the ground.