Weather
Wind: 26km/h NE
Humidity: 74%
Pressure: 1024.72mbar
UV index: 3
20/10°C
19/9°C
Groundwork weekend will be on the 13th and 14th of April this year from 10am, with a signing-on evening on the Saturday with drinks.
Each year the ground, pavilion and changing rooms need to be prepared for the coming season. Jobs that need to be done include cutting and strimming grass, pruning hedges, painting walls, rolling the square, hoovering and general spring cleaning.
If you could spare any time at all, even a couple of hours, it would be of great help. Refreshments will be available both days and we look forward to seeing as many of you as possible.
Problem retrieving data from Twitter