Congratulations, you just completed Horizontal Scrolling Announcement plugin installation.

Pavilion Project Update: Floor Preparations

Posted in Uncategorized on Thursday, November 28th, 2013 at 5:40 pm

The site is now ready to receive the concrete for the floor.

A containing wall and steel reinforcing steel grid are now in place ready to have the concrete floor poured in. The waste pipes have also now been installed as has the water feed to the square.

See more here

Other news you might be interested in:

Problem retrieving data from Twitter

Subscribe to Emails